Document Center
Search reports, plans, assessments, and other public documents published by SRTA.
All Documents
-
This document is Amendment 7 to Shasta County's 2025 Future Transportation Improvement Program (FTIP). It suggests several projects to make it safer for people to walk and bike. The East Palisades Multiuse Path project will build a Class 1 multiuse path, retaining walls, and concrete barriers. It will also fix drainage systems and put up fencing. The Victor Ave & Cypress Ave project will create shared paths, sidewalks, curbs, bike lanes, and safer intersections. The Shasta Dam Boulevard Complete Streets Project will add Class IV lanes, landscaped medians, better pedestrian crossings, and move a transit stop with better lighting on SR 151. The cost for these projects is $1,640,000 for the East Palisades Multiuse Path, $1,111,368 for the Victor Ave & Cypress Ave project, and $8,322,000 for the Shasta Dam Boulevard Complete Streets Project. These projects aim to make walking and biking easier and safer.
This plain-language summary was generated by AI and may contain errors. The linked document is the official record.
-
This document is Amendment 7 to Shasta's 2025 Future Transportation Improvement Program (FTIP). It proposes several safety and infrastructure improvements. In Shasta, they plan to improve shoulders and pavement on minor roads, costing $2,082,000. They also want to extend the Middle Creek Trail, a bike trail, for $1,800,000. This will make biking safer and more accessible. In Redding, they propose installing safety lighting along Buenaventura Boulevard for $1,400,000. This will help make the road safer at night. They also want to replace signal heads in Shasta, Lassen, and Plumas Counties for $1,330,000. This will improve traffic flow and safety. Additionally, they propose installing safety lighting near Wyndham Lane in Redding for $900,000. This will help make the area safer for pedestrians and drivers. These projects aim to enhance safety and improve transportation infrastructure across the region. They will make roads and trails safer and more accessible for everyone.
This plain-language summary was generated by AI and may contain errors. The linked document is the official record.
-
This document changes the Shasta Regional Transportation Agency's 2025 Future Investment Transportation Improvement Program (FTIP). It suggests updates to several road projects in Shasta County. These projects aim to fix drainage systems, upgrade pavement, and improve safety features like guardrails and traffic signals. The amendment includes seven sub-projects, each with specific locations and tasks. For example, one project will fix drainage systems near Redding, while another will upgrade pavement and drainage systems near Shasta Lake City. The total cost for these projects is $86,580,000. Funding comes from federal, state, and local sources. The projects are scheduled for different years, with some starting as early as 2025 and others extending to 2028. This amendment seeks to improve the region's transportation infrastructure and ensure the safety and efficiency of roadways.
This plain-language summary was generated by AI and may contain errors. The linked document is the official record.
-
This document amends Shasta County's 2025 Future Investment Transportation Plan (FTIP). It outlines changes to several bridge projects, including replacements and widenings. The total cost for these projects is $12,373,050. The projects aim to replace one-lane bridges with two-lane bridges and widen existing bridges to meet current standards. Some projects also include adding sidewalks and a two-way left turn lane. Funding comes from various sources, including the Highway Bridge Program (HBP) and local transportation funds. The projects are scheduled for completion between 2025 and 2028. Specific bridges mentioned include those over North Fork Cottonwood Creek, Moody Creek, Canyon Hollow Creek, and others. Toll credits have been programmed for some projects to help cover costs. The changes aim to improve safety and efficiency on these bridges, ensuring they can handle current and future traffic demands. This amendment reflects the county's commitment to maintaining and upgrading its transportation infrastructure.
This plain-language summary was generated by AI and may contain errors. The linked document is the official record.
-
This document changes Shasta County's 2025 Future Transportation Investment Plan (FTIP) to focus on safety. It suggests several projects to make roads safer in Shasta County and nearby areas. These projects include fixing curve warning signs on Routes 32, 36, 44, 70, 89, 139, 147, and 299, replacing old signs, barriers, and guardrails in Redding, and improving curves, widening shoulders, and adding guardrails and rumble strips in places like Montgomery Creek and Shingletown. It also plans to widen shoulders and add overhead lights in Anderson and Redding. The total cost for these projects is $76,395,000. $43,686,000 is for 2025, and the rest is for later years. The money will come from SHOPP Advance Construction funds, FHWA FTA funds, and state funds.
This plain-language summary was generated by AI and may contain errors. The linked document is the official record.
-
This document changes Shasta County's 2025 plan for fixing bridges. It adds four projects to improve bridges. The first project will cover three viaducts near Shasta Lake City with a special concrete. The second project, near Castella, will replace the bridge deck, paint parts, widen the edges, and fix the guardrails at Sweetbrier Avenue Overcrossing. The third project, near Whiskeytown, will replace the bridge deck, parts, and bridge rail at Whiskey Creek Bridge, and build 8-foot wide edges. The fourth project, also near Whiskeytown, will remove the old parts due to bad welds, build new parts with bike lanes and edges, and fix the bridge approach. The total cost for these projects is $101,444,000. The money comes from SHOPP, Advance Construction, and FHWA FTA Future Funds.
This plain-language summary was generated by AI and may contain errors. The linked document is the official record.
-
This document changes Shasta's 2025 Future Transportation Improvement Program (FTIP) for the Redding Area Bus Authority (RABA). It adds new projects to buy buses and vans for the transit system. The projects include replacing four medium buses for Dignity Health, one cutaway bus for Paratransit Service, and four RABA cutaway buses. The total cost for these new vehicles is $696,000. Money for this comes from the Federal Highway Administration (FHWA), Federal Transit Administration (FTA), and state funds. The money is spread out over several years. In 2025, $696,000 is needed. More funds of $174,000 are needed in 2026 and 2027. The goal is to update and replace older vehicles with newer, more efficient models. This will improve the region's list of planned transportation projects (the RTIP).
This plain-language summary was generated by AI and may contain errors. The linked document is the official record.
-
This document changes the 2025 Federal Transportation Improvement Program (FTIP) for the Shasta Regional Transportation Agency (SRTA). It adds a sub-project for Dignity Health Operating Assistance. This sub-project helps Dignity Health with transit programs. It backs up the main project GP211-0000-0057. The total cost for this sub-project is $240,000. Money comes from many sources, including the Federal Transit Administration (FTA) 5307 Urbanized Area Formula Program, FTA 5310 Elderly & Disabilities, FTA 5311 Non-Urbanized, Intercity Bus 5311-F, Public Transportation Account, Road Repair and Accountability Act of 2017 (SB1), SB 125 Transit Shasta Program, STA Transit Assist, and TDA. The funding for this sub-project is $37,780,054. The change proposes to give $240,000 to this sub-project in 2025 and 2026. The document does not say how this project will help or what it will do.
This plain-language summary was generated by AI and may contain errors. The linked document is the official record.
-
This document is the 2027 Federal Transportation Improvement Program (FTIP) for Shasta County, made by the Shasta Regional Transportation Agency (SRTA). It shows how the region plans to use federal money and other resources for transportation. The FTIP lists projects from the 2022 Regional Transportation Plan (RTP) and follows federal rules. It covers the next four years, with the first year's projects being the most important. The FTIP also has a financial plan. It shows that the region's spending on federal funds will be equal to or less than the money it expects to get. The document lists where the money will come from, including state and federal programs. It also shows the costs for keeping up and running the federal-aid facilities. The FTIP notes that there are risks, like economic downturns, disasters, or changes in federal funding. The FTIP can be changed as needed.
This plain-language summary was generated by AI and may contain errors. The linked document is the official record.
-
The Shasta Regional Transportation Agency (SRTA) is asking for proposals to hire a company to gather and report traffic data in Shasta County. The budget for this job is between $120,000 and $140,000. The job will last up to five years. The deadline to submit proposals is 3:00 p.m. PST on September 6 and October 4, 2024. The chosen company will collect data on cars, bikes, and people walking from different places. They must follow Highway Performance Monitoring System (HPMS) rules. Each proposal needs an introduction, a work plan, team details, examples of past work, and a cost proposal. Proposals will be judged on clarity, qualifications, cost, meeting deadlines, and if they include disadvantaged business enterprises. The contract is expected to start in October 2024 and end in December 2028. For more information, visit www.srta.ca.gov.
This plain-language summary was generated by AI and may contain errors. The linked document is the official record.
