RevAmd7 25FTIP 0083 Backup

Summary

This document amends Shasta County's 2025 Future Investment Transportation Plan (FTIP). It outlines changes to several bridge projects, including replacements and widenings. The total cost for these projects is $12,373,050. The projects aim to replace one-lane bridges with two-lane bridges and widen existing bridges to meet current standards. Some projects also include adding sidewalks and a two-way left turn lane. Funding comes from various sources, including the Highway Bridge Program (HBP) and local transportation funds. The projects are scheduled for completion between 2025 and 2028. Specific bridges mentioned include those over North Fork Cottonwood Creek, Moody Creek, Canyon Hollow Creek, and others. Toll credits have been programmed for some projects to help cover costs. The changes aim to improve safety and efficiency on these bridges, ensuring they can handle current and future traffic demands. This amendment reflects the county's commitment to maintaining and upgrading its transportation infrastructure.

This plain-language summary was generated by AI and may contain errors. The linked document is the official record.